Some tags are too long. With 114 characters this one is longer than 70 characters: "a lighthouse project funded by the swiss federal office of energy paves the way for the future electri..."
The basic idea behind Quartierstrom was that locally produced electricity should be locally consumed. To this end, a local electricity market was built in the pilot region of Walenstadt, allowing t...
H4
The project ended at the end of July 2020 with the publication of the final report.
H4
With the follow-up project Quartierstrom 2.0 the local electricity market in Walenstadt continues in a modified form. The further progress of the project is reported on the german version of the Qu...
H4
Final report on project Quartierstrom
H4
Two new scientific publictations
H4
Smart City Innovation Award für Quartierstrom 2.0
H5
Empty heading
Link structure 86% achieved
Internal links
(Important)
Some anchor texts are used more than once.
3 links don't have an anchor text.
There are 3 links with a trivial anchor text.
The number of internal links is ok.
None of the anchor texts is too long.
All internal links are not using dynamic parameters.
The page response time is slow (1.23 seconds). The response time should be less than 0.4 seconds. Slow websites are bad for search engine bots and also result in bad user experience.
The file size of the HTML document is fine (37 kB).
Please select one of the following options for your request.
Contact us!
Thanks for your message!
We have received your message and will process it as soon as possible.
Cookie Policy
We use cookies to make our site work and also for analytics and advertising purposes. You can enable or disable optional cookies as desired. See the following links for more information.
(Nice to have)